The Waterfield Kitchen Restaurant

The Waterfield Kitchen (TWK) Winchester, MA

A complete restaurant renovation for the Serenitee Group with all of the major construction divisions being coordinated and managed by Cyr. The original space had been converted from retail to a restaurant but did not fit the bold vision of the ownership and design team. All the finishes, mechanical systems and structural requirements were removed and restored for this state-of-the-art fine dining facility.

 

This slideshow requires JavaScript.

Cubesmart Sitework

At the same building site, the client requested Cyr provide two groundwater collection drainage systems. Our work entailed excavation, subgrade preparation, installation of all required vessels and piping. Backfilling and compaction were completed per Massachusetts Civil Engineered plan. In addition, 8000 s.f. of reinforced slab and foundation concrete were formed, reinforced and cast-in-place for subsequent metal buildings.

FRITO-LAYS

The Wilmington MA Frito Lay Distribution Center required a new cross-traffic shipping / receiving building to accommodate over-the-road tractor trailer traffic. The client required a fast tracked design-build addition to save countless hours of hand unloading of product. Our work included design, selective demolition, concrete foundation and flatwork, structural steel and insulated metal panels.

This slideshow requires JavaScript.