Project “Blue Sky”

Complete foundation and geotechnical support of the Gortons Seafood Center and 4th Floor addition. Marine Seawall Improvements and installation of 4 story elevator and hoistway. Construction of new 17,000 s.f. production building as well as complete interior restoration of all 4 floors.

Cubesmart Elevator

Construction of new 6-story elevator addition with machine room. Project involved a complex foundation system due to challenging subgrade conditions. Coordination with the existing tenants and operations were carefully considered during construction scheduling. New masonry was constructed with heavy reinforcement and to compensate for the existing building being out of plumb condition. New timber roof systems were constructed at the top of the elevator penthouse and machine room to complete the weather-tight shell. Cyr also coordinated electrical, HVAC, and elevator installation work as the General Contractor.

Cubesmart Sitework

At the same building site, the client requested Cyr provide two groundwater collection drainage systems. Our work entailed excavation, subgrade preparation, installation of all required vessels and piping. Backfilling and compaction were completed per Massachusetts Civil Engineered plan. In addition, 8000 s.f. of reinforced slab and foundation concrete were formed, reinforced and cast-in-place for subsequent metal buildings.

FRITO-LAYS

The Wilmington MA Frito Lay Distribution Center required a new cross-traffic shipping / receiving building to accommodate over-the-road tractor trailer traffic. The client required a fast tracked design-build addition to save countless hours of hand unloading of product. Our work included design, selective demolition, concrete foundation and flatwork, structural steel and insulated metal panels.

This slideshow requires JavaScript.