At the same building site, the client requested Cyr provide two groundwater collection drainage systems. Our work entailed excavation, subgrade preparation, installation of all required vessels and piping. Backfilling and compaction were completed per Massachusetts Civil Engineered plan. In addition, 8000 s.f. of reinforced slab and foundation concrete were formed, reinforced and cast-in-place for subsequent metal buildings.
